Skip to Main Content

Library Renovation Project: Plans & Renderings

The library (2nd & 3rd floors of the Learning Commons building) will undergo a major renovation project until the spring of 2026.

The Library Today

Problems that will be addressed by the renovation:

  • Cracked roof drain pipes leak water when it rains
  • Outdated infrastructure
  • Dark interior spaces
  • Lack of group study rooms
  • Inadequate staff workspaces
  • Entrances to the stairwells up to the 3rd floor are narrow and not readily visible
Current 3rd Floor Layout
floorplan

plastic tubes from the ceiling into trash cans plastic tubes into buckets containing water workroom with plastic tubes from the ceiling picture of narrow doorway to stairwell interior of dimly lit stairwell

 

The Library Tomorrow

Renovation floorplan

View of the 3rd floor from the entry stair

Computer rendering pf 3rd floor
Photo-like rendering of 3rd floor